GAMBARAN 5M (MAN, MONEY, METHOD, MATERIAL DAN MACHINE) DALAM PELAKSANAAN DISCHARGE PLANNING DI RUANG RAWAT INAP BEDAH RSUD WATES KULON PROGO

GAMBARAN 5M (MAN, MONEY, METHOD, MATERIAL DAN MACHINE) DALAM PELAKSANAAN DISCHARGE PLANNING DI RUANG RAWAT INAP BEDAH RSUD WATES KULON PROGO.

[thumbnail of Abstrak_Bab I_Dapus]
Preview
Text (Abstrak_Bab I_Dapus)
Abstrak_Bab I_Dapus.pdf

Download (518kB) | Preview
Item Type: Thesis
Subjects: ILMU ILMU KESEHATAN > ILMU KEPERAWATAN
Depositing User: Dian Nugroho Prasetyo. SIP. M.IP
Date Deposited: 19 Jun 2020 01:36
Last Modified: 19 Jun 2020 01:36
URI: http://elibrary.almaata.ac.id/id/eprint/1505

Actions (login required)

View Item
View Item